Clients

Comparison of Construction Costs for Full Mine Liabilities and Stand alone Waste Dumps

  • Reduced Estimated Rehabilitation Costs

    Client Estimated Closure Liabilities compared to 3DDG Landform Design Models.

Comparison of Construction Costs

  • Construction Ready Landforms

    We design final landforms to the Clients Specific requirements and as we understand the operations of Earthworks and Production Dozing we create designs that lower the cost to build and reduce fuel used to construct them.

Smarter , more efficient Landform Designs

  • Reduced Construction Cost

    Same Landform Design Parameters, resulting in Smarter Landform designs, resulting in more efficient construction. we lower the cost of construction by moving the material smarter and more efficiently

In-Pit Dozing

  • Dump Profile Option #1

    3D Models used in our Priority Dozer simulation software

  • Dump Profile Option #2

    3D Models used in our Priority Dozer simulation software

  • Analysis Table

    Comparison Results

Hardware Selection

  • Field Testing of Different High Capacity Blades

    3DDG have managed the Field testing and implementation of High Capacity Dozer blades for Production Dozing.

    Contact us to find out more information about Dozer Blade options to increase your Dozer productivity.